Smithfield Square (Hornsey Depot) comes to life with Alumasc’s Hydrotech Structural Waterproofing and Blackdown Green Roof Systems

Smithfield Square (Hornsey Depot) comes to life with Alumasc’s Hydrotech Structural Waterproofing and Blackdown Green Roof Systems


Smithfield Square is one of St James Homes latest
developments offering luxury suites, 1 and 2 bedroom apartments. The two
live work units give residents the opportunity to relax in luxury and
comfort, whilst being able to work with convenience.

Smithfield Square London

Image Source: St James Property Developers, London

At roof and podium level a reliable, long lasting solution was needed
for waterproofing the various areas, public spaces and recreational
areas prior to architectural landscaping being installed.

Alumasc Roofing’s Hydrotech Hot Melt system,
which demonstrates a zero product failure over a 50 year track record,
provided the ideal waterproofing solution, 12,000m2 was installed in
total.

The project included Brown roofs
designed in accordance with planning constraints and London Plan
guidelines, materials supplied by Blackdown Green Roofs, a Division of
Alumasc Roofing. This combination of Hydrotech waterproofing and
Blackdown Green Roofing systems allows Hornsey Depot to benefit from
various ‘green’ spaces and St James with a one stop solution in
compliance to NHBC Part 7 policy.

For further information regarding Blackdown Green Roofs or Hydrotech
Structural Waterproofing please call our technical department on 03335
771 500.





Source link