Temple, TX (Bell Co.) –
Work includes constructing a new 40,377 sf, two story structural steel frame athletic training building with Locker Rooms, Training Room, PEMB Weight Room, Classrooms, and Offices.
This package’s scope of work consists of, but is not limited to Building and Selective Demolition, Abatement, Building Concrete Work including piers, Polished Concrete w/Sealer, Masonry, Cold Formed Metal Framing, Decorative Metals Railings, Rough Carp., Finish Carp./Millwork, Waterproofing, Insulation, Air Barrier, Metal Wall & Composite Wall Panels, TPO Roofing, Flashings, Caulking, Expansion Joint Covers, Hollow Metal Doors/Frames/Hardware, Aluminum Doors/Aluminum Storefronts/Glazing, Mirrors, Drywall/Acoustical, Tile, Carpet/Resilient Flooring/Base, Precast Terrazzo, Acoustic Panels, Painting, Div. 10 specialties, Accordion and folding Partitions, Corner Guards, Canopies, Laundry Equipment, Appliances, Ice Machines, Photo Murals, Window coverings, Mats & Frames, Fixed Audience Seating, Therapeutic Pool Equip., Fire Sprinklers, Plumbing, HVAC, Test & Balance, HVAC Controls, Electrical, Structured Cabling, Telecom/Sound Systems, Fire Alarm, Earthwork, Termite Pretreatment, Asphalt/Concrete Paving, Sidewalks, Pavement Markings, Fencing, Bike Racks, Landscaping, and Site Utilities.
CONSTRUCTION CATEGORIES BIDDING THIS PROJECT:
PROJECT DOCUMENTS ON THIS PROJECT:
First Reported on Friday, June 30, 2023 – Last Updated 7/24/2023 11:36:58 AM |